CLIENT | M/S SMS SIEMAG |
PROJECT NAME | BHUSHAN STEEL PROJECT |
WORK AREAS | 2 X 180 LD CONVERTERS (EXPANSION PHASE -II)-COOLING WATER PIPING, HOOD AREA PIPING, QUENCHER PIPING, TANK AND PUMP PIPING, ID FAN DISCHARGE PIPING, NITROGEN PIPING, COG & COMPRESSED AIR PIPING, PIPE SUPPORTS ENGINEERING, SECONDARY DE-DUSTING, TRENCH, BOOSTER FAN, PUMP HOUSE. |
CLIENT | M/S TATA PROJECT LTD |
PROJECT NAME | 1.2 MTPA PELLETIZING PLANT FOR NMDC |
WORK AREAS | PRE-BID SUPPORT, GROUND HOPPER, HPGR BUILDING, JUNCTION HOUSES, WASTE GAS CHIMNEY, PROPORTIONING BUILDING, MIXTURE HOUSE, BALLING/PELLETISING UNIT, INDURATION BUILDING, CIRCULAR COOLER, SCREENING HOUSE, FINE BINS, PELLET STORAGE AREA, MATERIAL HANDLING SYSTEM, PCI SYSTEM, FLUX PREPARATION & FEEDING SYSTEM, STACKS, PIPE & CABLE GALLERY, WATER RESERVOIRS AT DIFFERENT LEVELS, AIR COMPRESSOR STATIONS, CABLE TUNNELS, WATER PUMP HOUSE, POWER ROOMS, ESP & BAG FILTERS, AUXILIARY BUILDINGS, DUCTING. |
CLIENT | M/S SMS SIEMAG |
PROJECT NAME | JINDAL STEEL & POWER LIMITED |
WORK AREAS | INTERCONNECTING NITROGEN PIPELINE & SUPPORT STRUCTURES. |
CLIENT | M/S TOPCEM INDIA |
PROJECT NAME | 33KV SWITCH YARD AT 2000 TPD GRINDING UNIT |
WORK AREAS | TOTAL PROJECT MANAGEMENT INVOLVING CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL WITH FOUNDATION, SUPER STRUCTURE, EARTHING, PIPING, DISTRIBUTION, ILLUMINATION, CABLING. |
CLIENT | M/S LARSEN & TOUBRO LIMITED |
PROJECT NAME | WASTE WATER TREATMENT PLANT OF SAIL BSP BF8 & KPO BF1 |
WORK AREAS | WATER SYSTEM , P&ID, EQUIPMENT LAYOUT, PIPING & VALVE SYSTEM OF PUMP HOUSE CONSISTING OF PUMP FLOOR, FILTER & HEAT EXCHANGER FLOOR, ISOMETRICS. |
CLIENT | M/S SINO STEEL EQUIPMENT & ENGINEERING |
PROJECT NAME | 1.2 MTPA PELLETIZING PLANT FOR NMDC INSTRUMENTATION |
WORK AREAS | PROPORTIONING BUILDING, ROTARY KILN, ANNULAR COOLER, TRAVELLING GRATE, BALLING SHOP, MIXER ROOM, PCI, ADDETIVE-BINDER BUILDING, MULTICYCLONE FOUNDATION, SCREEN HOUSE, MILL SHOPS. |
CLIENT | M/S ALL MINERALS |
PROJECT NAME | 200 TPH IRON BENEFICIATION PLANT |
WORK AREAS | JIG BUILDING, SCRUBBER BUILDING, TAILING THICKENER, FILTER PRESS, ROD MILL, SLIME POND, COMPRESSED AIR LINE, PIPING, IRON-ORE SLURRY LINE, PUMP GLAND SEALING WATER LINE, FLUSHING & CLEANING WATER LINE, VALVES AND PIPE SUPPORTS, CONVEYOR & TRANSFER HOUSE. |
CLIENT | M/S NEO METALIKS |
PROJECT NAME | ANNULAR SINTER PROJECT |
WORK AREAS | TOTAL PROJECT MANAGEMENT INVOLVING CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, UTILITIES INCLUDING POLLUTION CONTROL SYSTEM AND ACVS. |
CLIENT | M/S UTKARSH TUBES AND PIPES LTD |
PROJECT NAME | PVC PLANT TUBE MILL & ROLLING MILL |
WORK AREAS | PVC PIPING, PIPE FITTINGS, MS PIPING, ROLLING MILL FOR ANGLE ROLLING WITH INTERPLANT ROAD & DRAINAGE. |
CLIENT | M/S ALL MINERALS ASIA |
PROJECT NAME | 180 TPH COAL DESHALING PLANT |
WORK AREAS | BELT CONVEYORS & TRANSFER TOWERS WITH GANTRY GIRDER, ROOF GIRDER, TRUSS, BRACINGS, TRESTLE. |
CLIENT | M/S DANIELI INDIA LIMITED |
PROJECT NAME | REVAMPING OF TARATALA FACTORY & OFFICE, AUTOMATION DIVISION |
WORK AREAS | SHED EXPANSION, WATCH TOWERS, GUARD QUARTER, ELECTRICAL CONTROL ROOM, OFFICE BUILDING, ROADS & DRAINAGE, WATER-AIR PIPING SYSTEM, EOT CRANE GIRDER SPECIFICATIONS, ILLUMINATION SYSTEM, EATHING, CABLING, POWER DISTRIBUTION, LPS, SURVEY & SOIL TESTING. |
CLIENT | M/S PAUL WURTH |
PROJECT NAME | BHILAI STEEL PLANT BF-8 |
WORK AREAS | INBA 1 & 2- STEEL STRUCTURE COMPRISING OF GRANULATION TANK & DEWATERING SYSTEM, RUNG LADDER, SPLICES, CONNECTION JOINTS, BASE PLATES AND MOUNTING BRACKETS, STRESS ANALYSIS. |
CLIENT | M/S BEEKAY ENGINEERING CORPORATION |
PROJECT NAME | HOT METAL DESULPHURIZATION PLANT FOR BHILAI STEEL PLANT |
WORK AREAS | NITROGEN, WATER AND MISC UTILITY PIPING WITH VALVES, INTERCONNECTING PIPEWORK FOR HYDRAULICS AND LUBRICATION, P&ID. |
CLIENT | M/S B.K.PODDER |
PROJECT NAME | PULP AND PRINTING FACTORY |
WORK AREAS | TOTAL PROJECT MANAGEMENT FOR 9 ACRE LAND AREA INCLUDING LANDSCAPING. 4 PROCESISNG ZONES OF PAPER PRODUCTION, AUXILIARY BUILDINGS, WATER TANKS, RAIN WATER HARVESTING, STAFF QUARETER, CANTEEN, PIPING, ELECTRICALS, ROADS & DRAINAGE. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | DUCTILE IRON PIPE PLANT & ROLLING MILL |
WORK AREAS | BF GAS/LDO AND STEAM DISTRIBUTION SYSTEM WITH PFG & CONTROL SCHEME. |
CLIENT | M/S BHILAI ENGINEERING CORPORATION |
PROJECT NAME | VISHAKHAPATNAM STEEL PLANT |
WORK AREAS | GAS PIPE LINE AND PIPE SUPPORT. |
CLIENT | M/S BENGAL TOOLS LTD |
PROJECT NAME | AMMONIUM SULPHATE PLANT FOR VISHAKAPATNAM STEEL PLANT |
WORK AREAS | AIR CONDITIONING SYSTEM, VENTILATION SYSTEM, FIRE DETECTION AND FIGHTING, MLDB-SLDB-PDB, CABLING SYSTEM, POWER DISTRIBUTION SYSTEM, DRIVE MOTORS. |
CLIENT | M/S SCHENCK PROCESS INDIA LTD |
PROJECT NAME | COAL WASHERY PLANT AT TURKEY |
WORK AREAS | HOPPER, THICKENER, JUNCTION HOUSE, MCCP MAIN BUILDING, MCC, BOULDER SOLED EARTHEN EFFLUENT POND. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | DUCTILE IRON PIPE PLANT |
WORK AREAS | 7 CRUCIBLE X 10T CAPACITY INDUCTION FURNACE, MELTING UNITS, CASTING UNITS, SUB-STATION, WATER SUPPLY SYSTEM, PIPING SYSTEM, PUMPS, AIR COMPRESSORS WITH AFTER COOLERS, MOISTURE SEPARATORS, RECEIVERS, AIR DRYERS, FUME EXTRACTION SYSTEM, AIR POLLUTION CONTROL SYSTEM, HT-LT PANELS, POWER DISTRIBUTION, CABLING-EARTHING SYSTEM, LIGHTING SYSTEM. |
CLIENT | M/S SMS SIEMAG |
PROJECT NAME | VISHAKHAPATNAM STEEL PLANT & IISCO BURNPUR |
WORK AREAS | FIRE FIGHTING SYSTEM, HVAC FOR STAINLESS STEEL MAKING AND CASTING PLANT AND COG & STEAM PIPE STRESS ANALYSIS WITH GAS PURGING SYSTEM. UTILITY PIPING & LD CONVERTER. |
CLIENT | M/S SIDDAGANGA ALLOYS ISPAT PVT LTD |
PROJECT NAME | 250 TPD ROLLING MILL PLANT |
WORK AREAS | TOTAL PROJECT MANAGEMENT TILL COMMISSIONING CONSISTING OF MAIN PLANT AND AUXILIARY BUILDINGS, PIPING OF COOLING WATER, PUMPS, WATER TANK, COMPRESSED AIR-FUEL OIL, POLLUTION CONTROL, ELCTRICAL SYSTEM COMPRISING OF TRANSFORMER,SUBSTATION,HT/LT PANEL, POWER DISTRIBUTION, EARTHING SYSTEM, LIGHTNING PROTECTION SYSTEM, CABLING. |
CLIENT | M/S RASHMI GROUP |
PROJECT NAME | SMS-II |
WORK AREAS | 2*20MT CAPACITY INDUCTION MELTING FURNACE, LADLE REFINING SURFACE, CONTINUOUS CASTING MACHINES, ENHANCEMENT OF 132 KV SUB-STATION BY ADDING ONE 30/35 MVA, WATER TREATMENT PLANT, RESERVOIRS, PUMPS, COOLING TOWERS, AIR POLLUTION CONTROL SYSTEM, AIR COMPRESSORS, HT-LT PANEL, POWER DISTRIBUTION, CABLING SYSTEM, EARTHING SYSTEM, LIGHTING SYSTEM. |
CLIENT | M/S DANIELI INDIA LIMITED |
PROJECT NAME | AUXILIARY SYSTEM FOR NISCO IN IRAN |
WORK AREAS | LIGHTNING PROTECTION SYSTEM, TELECOMMUNICATION SYSTEM, CCTV SYSTEM, OVERHEAD TRANSMISSION LINE, ILLUMINATION SYSTEM, PAGER & CLOCK SYSTEM, FDA & FIRE PROTECTION SYSTEM, ACVS SYSTEM. |
CLIENT | M/S BHILAI ENGINEERING CORPORATION |
PROJECT NAME | COKE OVEN, IISCO, BURNPUR |
WORK AREAS | PLANT BUILDING, VENTILATION & AIR CONDITIONING SYSTEM, PI DIAGRAM, ACVS, DUCTING. |
CLIENT | M/S SMS DEMAG |
PROJECT NAME | SALEM STEEL PLANT |
WORK AREAS | AIR CONDITIONING SYSTEM & CHILLING WATER SYSTEM FOR CASTER BUILDING AREA COMPRISING OF MAIN CONTROL ROOM, PLC/DRIVE ROOM, TCM PULPIT, SHIFT OFFICE. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | INDUCTION FURNACE 2*8T AND 2*15T & ROLLING MILL OF 20 TPH |
WORK AREAS | MAIN PRODUCTION BUILDINGS OF SMS & ROLLING MILL, MATERIAL HANDLING SYSTEM, INDUCTION FURNACES, DRIVES, LADLES, ROLLER TABLES, COOLING BED, SHEARS, PINCH ROLLS, MACHINE FOUNDATIONS, WATER COOLING SYSTEM, FIRE FIGHTING SYSTEM, ROADS AND DRAINAGE, PIPING SYSTEM FOR AIR-WATER-FUEL OIL, UTILITY SYSTEM, HT SYSTEM, POWER DISTRIBUTION, CONTROL SCHEME OF EQUIPMENTS, CONTROL GEARS, LIGHTING SYSTEM, CABLE SELECTION & ROUTING, PANELS. POLLUTION RELATED STUDY DONE FOR 3LAC MT ROLLING MILL ON BASIS OF WHICH POLLUTION CONTROL SYSTEM WAS DESIGNED. |
CLIENT | M/S BHILAI ENGINEERING CORPORATION |
PROJECT NAME | COKE OVEN PLANT FOR IISCO MODERNIZATION |
WORK AREAS | PI DIAGRAM, ACVS, DUCTING, HVAC SYSTEM FOR PLANT MODERNIZATION. |
CLIENT | M/S SHAKTI DEVELOPMENT PVT LTD |
PROJECT NAME | BAR ROLLING MILL OF CAPACITY 150,000 MT |
WORK AREAS | MAIN PLANT AND AUXILIARY BUILDINGS LIKE ELECTRICAL CONTROL ROOMS, SHOPS, LABORATORY, WATER COMPLEX, STORE SHEDS, ROADS & DRAINAGE. DESIGN AND SELECTION OF RE-HEATING FURNACE, BILLET TRANSFER, REJECTION SYSTEM, ROUGHING-INTERMEDIATE-FINISHING GROUP, COOLING BED, MOTORS, ROLLER TABLES, TMT STATION, EOT CRANES, MATERIAL HANDLING SYSTEM, PIPING FOR WATER-COMPRESSED AIR-FUEL OIL-GAS, SUB-STATION, TRANSFORMERS, BREAKERS, ISOLATORS, FEEDERS, LT PANEL, DISTIBUTION SYSTEM, EARTHING SYSTEM, PLANT LIGHTING SYSTEM, CABLING SYSTEM, LIGHTNING PROTECTION SYSTEM, RAIN WATER HARVESTING SCHEME. |
CLIENT | M/S MEGATHERM ELECTRONICS |
PROJECT NAME | STEEL MELTING SHOP & INDUCTION MELTING FURNACES |
WORK AREAS | PUMPS, COOLING TOWER, DM & SOFTENING PLANT, AIR COMPRESSOR, ALL PIPE LINES, POWER SYSTEM, DISTIRBUTION & LT PANELS, EARTHING SYSTEM, CABLING SYSTEM, LIGHTING SYSTEM, TRANSFORMERS, FUME EXTRACTION SYSTEM. |
CLIENT | M/S GSD CASTINGS PVT LTD |
PROJECT NAME | STEEL MELTING & BILLET CASTING |
WORK AREAS | FEASIBILITY REPORT. |
CLIENT | M/S ALSTOM DURGAPUR |
PROJECT NAME | EXPANSION PROJECT FOR BOILER PLANT |
WORK AREAS | EXPANSION OF SHED WITH CRANE GIRDER ON WEST SIDE WITH AUXILIARY BUILDINGS. |
CLIENT | M/S DANIELI INDIA LIMITED |
PROJECT NAME | CROP SHEAR REFURBISHMENT AT BOKARO STEEL PLANT |
WORK AREAS | RE-ENGINEERING OF STRUCTURES AS PER MECHANICAL G.A, CABLE SYSTEM, SENSOR MOUNTING ARRANGEMENT, WATER-COMPRESSED AIR PIPING, COMPRESSOR WITH DRYER & RECEIVER, CHILLER. |
CLIENT | M/S JACOBS |
PROJECT NAME | EVIONIC INDUSTRIES |
WORK AREAS | PIPING STRESS ANALYSIS. |
CLIENT | M/S JACOBS |
PROJECT NAME | 4 MTPA PELLETIZING PLANT FOR JINDAL STEEL & POWER LIMITED |
WORK AREAS | PIPING STRESS ANALYSIS. |
CLIENT | M/S MALDA METAL PVT LTD |
PROJECT NAME | ROLLING MILL PLANT |
WORK AREAS | MAIN PLANT AND AUXILIARY BUILDINGS INCLUDING TRANSFORMER-FURNACE FOUNDATION, PLATFORMS, MAIN MILL MOTOR FOUNDATION, RE-HEATING FURNACE, BILLET TRANSFER, REJECTION SYSTEM FOR UNQUALIFIED BILLET, ROUGHING-INTERMEDICATE-FINISHING GROUPS, COOLING BED, TMT STATION, EOT CRANES, PUMPS, COOLING TOWER, WATER TREATMENT SYSTEM, AIR COMPRESSOR, HT/LT PANELS, TRANSFORMERS, BREAKERS, ISOLATORS, EARTHING SYSTEM, PLANT LIGHTING SYSTEM. |
CLIENT | M/S B.S.SPONGE PVT LTD |
PROJECT NAME | INDUCTION FURNACE-8T |
WORK AREAS | PRODUCTION PLANT, EQUIPMENTS, MATERIAL HANDLING SYSTEM, PLANT WATER SUPPLY & DISTRIBUTION SYSTEM, PIPING, UTILITY SYSTEM, SUBSTATION, H.T/LT WITH FEEDERS, PANELS, CABLING, EARTHING, ILLUMINATION SYSTEM, POWER DISTRIBUTION WITH PROVISION OF FUTURE EXPANSION OF 12MT X 2FURNACE WITH 4/7 CONCAST. |
CLIENT | M/S EXCEL CONSULTANTS |
PROJECT NAME | BINA CAPTIVE POWER PLANT |
WORK AREAS | REVIEW ENGINEERING AND VETTING WITH REPORT SUBMISSION FOR 35MW POWER-STATION SUPPLIED BY BHEL WITH OUR CONSORTIUM PARTNER. IT ALSO COMPRISES OF MODELING & ANALYSIS OF STEAM PIPELINE. |
CLIENT | M/S ARORA STEEL |
PROJECT NAME | NEW STEEL MELTING SHOP WITH 35T EAF |
WORK AREAS | TOTAL ENGINEERING FOR SMS WHICH INCLUDES 35T EAF, 35T LADDLE REFINING FURNACE, 35T VD, FERRO-ALLOY ADDITION SYSTEM, CONTINUOUS CASTING MACHINE, 66KV SUB-STATION, HANDLING SYSTEM FOR DRI-LIME-FERRO ALLOYS. |
CLIENT | M/S HIMADRI CHEMICALS |
PROJECT NAME | SINGUR PLANT |
WORK AREAS | STRESS ANALYSIS OF COAL & PITCH TAR LINE WITH PRIMARY SUPPORTS. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | ULTRATECH CEMENT PLANT & GIS SUB-STATION AT GUMA |
WORK AREAS | CABLE GALLERY CIVIL & STRUCTURALS FOR ULTRATECH. PUMP HOUSE, OVERHEAD TANK, EOT BUILDING, RAIN WATER HARVESTING FOR GUMA. |
CLIENT | M/S UTKARSH TUBES AND PIPES LTD |
PROJECT NAME | PVC PIPE PLANT, GURAP |
WORK AREAS | ARCHITECTURAL AND 3D, CIVIL AND STRUCTURALS, RAW MATERIAL LOADING AND UNLOADING CUSTOMIZED SOLUTION, FINISHED GOODS LOADING CUSTOMIZED SOLUTION, ROAD, DRAINAGE, RAIN WATER HARVESTING, FIRE FIGHTING RESERVOIR WITH PUMP HOUSE, TOTAL PIPING ENGINEERING INCLUDING PFD-P&ID-ROUTING, HVAC, HT & LT CABLING, ILLUMINATION, EARTHING, LIGHTNING PROTECTION, TELECOMMUNICATION, CCTV. |
CLIENT | M/S UNIMAC MACHINERIES FZE, DUBAI |
PROJECT NAME | STEEL PLANT, PARAGUAY |
WORK AREAS | FEASIBILITY STUDY, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, LRF, CCM, BILLET FEEDING, BAR ROLLING MILL, MEDIUM SECTION MILL, SUB-STATIONS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, OXYGEN PLANT, AOD SYSTEM, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, AFFLUENT TREATMENT SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S BSRM |
PROJECT NAME | INTAKE WELL-BANGLADESH |
WORK AREAS | FEASIBILITY STUDY AND LAYOUT PREPARATION FOR STATUATORY ACTIVITIES AND PERMISSION FROM WATER BODY MANAGEMENT, BANGLADESH. |
CLIENT | M/S TATA PROJECTS LTD |
PROJECT NAME | 1.2 MTPA PELLET PLANT, NMDC-DONIMALAI |
WORK AREAS | DELAY ANALYSIS AND COST ANALYSIS FOR CIVIL, STRUCTURAL, MECHANICAL AND ELECTRICAL PACKAGES. |
CLIENT | M/S TECHNO ELECTRIC |
PROJECT NAME | MITSUBISHI PLANT AT HALDIA, 80MVR REACTOR AT SOLAPUR-JHARSUGUDA |
WORK AREAS | FIREFIGHTING, FIRE DETECTION, HVAC, ISOMETRICS, PIPING. |
CLIENT | M/S UNISEVEN ENGINEERING |
PROJECT NAME | CHUTES FOR BALARIA & MOCHIA MINES, PRE BID FOR PROPOSED LEACHING WITH ZINC FERRITE RESIDUE FUMING PROJECT AT HZL |
WORK AREAS | SITE RELATED DRAWINGS FOR 15 CHUTES WITH RELATED CONVEYORS IN BALARIA & MOCHIA. PRE-BID SUPPORT FOR CONVEYORS, SCRAPPERS, WEIGH FEEDERS, PRESS HOPPERS, TANKS, BINS, DOUBLE DECK SCREEN, PIPE LINES, ELECTRICALS, TRESTLES, GALLERY STRUCTURES, DUST SUPPRESSION AND SPRINKER SYSTEM. |
CLIENT | M/S TOP STEEL KENYA LTD |
PROJECT NAME | STEEL PLANT, KENYA |
WORK AREAS | BILLET FEEDING, 150,000 TON/ANNUMREBAR ROLLING MILL, 50,000 TON/ANNUM SECTION MILL, 33KV SWITCHYARD, POWER DISTRIBUTION, HT-LT ELECTRICALS, UTILITIES, CIVIL & STRUCTURALS, PUMPS. COOLING TOWERS, PIPING, SEWERAGE TREATMENT, 132KV SUB-STATION, EARTHING, LIGHTENING PROTECTION, ILLUMINATION, TRANSMISSION TOWERS ETC. |
CLIENT | M/S STERLING & WILSON |
PROJECT NAME | OPTCL-8 SUBSTATION |
WORK AREAS | SLD, LAYOUT, EKD, CABLE SCHEDULE & TERMINATION, TRENCH LAYOUTS, EARHTING, LIGHTENING PROTECTION, ILLUMINATION, POLE STRUCTURES, BUILDINGS, EQUIPMENT AND TOWER FOUNDATIONS, ROAD & DRAINAGE, RETAINING WALL, BOUNDARY. |
CLIENT | M/S PRITHVI FERRO ALLOYS |
PROJECT NAME | STEEL PLANT, IVORY COAST |
WORK AREAS | FEASIBILITY STUDY, BANKING REPORT, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, AOD, CCM, BILLET FEEDING, BAR ROLLING MILL, RE-HEATING FURNACE, STRUCTURAL MILL, SUB-STATIONS, FACTORY SHEDS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S STARK STEEL |
PROJECT NAME | STEEL PLANT, GHANA |
WORK AREAS | FEASIBILITY STUDY, BANKING REPORT, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, AOD, ELECTRIC ARC FURNACE, SMS, CCM, BILLET FEEDING, BAR ROLLING MILL, RE-HEATING FURNACE, STEEL GRINDING MEDIA BALL MILL, OXYGEN PLANT, SUB-STATIONS, FACTORY SHEDS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S SCHENCK PROCESS INDIA LTD |
PROJECT NAME | MADHUBAND NLW COAL WASHERY, BCCL |
WORK AREAS | PRESSURIZED VENTILATION SYSTEM, WATER SPRINKLER SYSTEM, DUST SUPPRESSION SYSTEM, FIRE FIGHTING & FIRE HYDRANT SYSTEM, FDA. |
CLIENT | M/S UNISEVEN ENGINEERING |
PROJECT NAME | ZINC FERRITE RESIDUE FUMING PROJECT, HINDUSTAN ZINC LIMITED |
WORK AREAS | BELT CONVEYORS WITH FEEDING CONVEYORS, TECHNOLOGICAL STRUCTURES, SCRAPPER CONVEYING SYSTEM, WEIGH FEEDERS, ZINC FERRITE PRESS HOPPERS, TANKS, LIMESTONE BIN, ZINC FERRITE BIN, LUMP COAL BIN, SILICA BIN, PNEUMATIC CONVEYING SYSTEM, DOUBLE DECK SCREEN, FILTER PRESS AREA PIPELINE, CIRCULAR CONVEYOR GALLERY, PIPE TRESTLE FOR SLURRY LINES, DUST SUPPRESSION SYSTEM AT TRUCK UNLOADING AREAS, SPRINKLER SYSTEM FOR LUMP COAL STOCK PILE AREA, ELECTRICAL & INSTRUMENTATION. |
CLIENT | M/S HABESHA STEEL MILLS |
PROJECT NAME | STEEL PLANT REVAMPING, ETHIOPIA |
WORK AREAS | PASS DESIGN MODIFICATION FOR REVAMPING OF 200 TPD EXISTING ROLLING MILL TO INCREASE PRODUCTION IN 2 PHASES OF 8600 T PER MONTH AND 9300 T PER MONTH, RELATED MECHANICAL-ELECTRICAL SYSTEM MODIFICATION, CIVIL AND STRUCTURAL ENGINEERING, FINISHED PRODUCT SHED MODIFICATION, ROLL SPECIFICATIONS. |
CLIENT | M/S STARK STEEL |
PROJECT NAME | STEEL PLANT, GHANA |
WORK AREAS | FORGING SHOP, SKEW BALL MILL, MACHINE FOUNDATIONS FOR FORGING PRESS-FORGING HAMMER-BILLET SHEAR-ROLLER TABLE-QUENCHING TANK, CABLE & PIPE TRENCH, 33KV SUB-STATION, PUMP HOUSE, WATER TANK, WEIGH BRIDGE, GOOMTY, STAFF QUARTER, BOUNDARY WALL, GATE, ROAD & DRAINAGE, COMPRESSED AIR SYSTEM, WATER SYSTEM, TECH SPEC FOR SOFTENING PLANT, ELECTRICAL LAYOUT AND DISTRIBUTION SYSTEM, 33KVA TRANSMISSION LINE ENGINEERING, EARTHING SYSTEM, LIGHTENING PROTECTION SYSTEM, ILLUMINATION SYSTEM, CABLE ENGINEERING. |