CLIENT | M/S TATA PROJECT LTD |
PROJECT NAME | 1.2 MTPA PELLETIZING PLANT FOR NMDC |
WORK AREAS | PRE-BID SUPPORT, GROUND HOPPER, HPGR BUILDING, JUNCTION HOUSES, WASTE GAS CHIMNEY, PROPORTIONING BUILDING, MIXTURE HOUSE, BALLING/PELLETISING UNIT, INDURATION BUILDING, CIRCULAR COOLER, SCREENING HOUSE, FINE BINS, PELLET STORAGE AREA, MATERIAL HANDLING SYSTEM, PCI SYSTEM, FLUX PREPARATION & FEEDING SYSTEM, STACKS, PIPE & CABLE GALLERY, WATER RESERVOIRS AT DIFFERENT LEVELS, AIR COMPRESSOR STATIONS, CABLE TUNNELS, WATER PUMP HOUSE, POWER ROOMS, ESP & BAG FILTERS, AUXILIARY BUILDINGS, DUCTING. |
CLIENT | M/S TOPCEM INDIA |
PROJECT NAME | 33KV SWITCH YARD AT 2000 TPD GRINDING UNIT |
WORK AREAS | TOTAL PROJECT MANAGEMENT INVOLVING CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL WITH FOUNDATION, SUPER STRUCTURE, EARTHING, PIPING, DISTRIBUTION, ILLUMINATION, CABLING. |
CLIENT | M/S SINO STEEL EQUIPMENT & ENGINEERING |
PROJECT NAME | 1.2 MTPA PELLETIZING PLANT FOR NMDC INSTRUMENTATION |
WORK AREAS | PROPORTIONING BUILDING, ROTARY KILN, ANNULAR COOLER, TRAVELLING GRATE, BALLING SHOP, MIXER ROOM, PCI, ADDETIVE-BINDER BUILDING, MULTICYCLONE FOUNDATION, SCREEN HOUSE, MILL SHOPS. |
CLIENT | M/S NEO METALIKS |
PROJECT NAME | ANNULAR SINTER PROJECT |
WORK AREAS | TOTAL PROJECT MANAGEMENT INVOLVING CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, UTILITIES INCLUDING POLLUTION CONTROL SYSTEM AND ACVS. |
CLIENT | M/S UTKARSH TUBES AND PIPES LTD |
PROJECT NAME | PVC PLANT TUBE MILL & ROLLING MILL |
WORK AREAS | PVC PIPING, PIPE FITTINGS, MS PIPING, ROLLING MILL FOR ANGLE ROLLING WITH INTERPLANT ROAD & DRAINAGE. |
CLIENT | M/S ALL MINERALS ASIA |
PROJECT NAME | 180 TPH COAL DESHALING PLANT |
WORK AREAS | BELT CONVEYORS & TRANSFER TOWERS WITH GANTRY GIRDER, ROOF GIRDER, TRUSS, BRACINGS, TRESTLE. |
CLIENT | M/S DANIELI INDIA LIMITED |
PROJECT NAME | REVAMPING OF TARATALA FACTORY & OFFICE, AUTOMATION DIVISION |
WORK AREAS | SHED EXPANSION, WATCH TOWERS, GUARD QUARTER, ELECTRICAL CONTROL ROOM, OFFICE BUILDING, ROADS & DRAINAGE, WATER-AIR PIPING SYSTEM, EOT CRANE GIRDER SPECIFICATIONS, ILLUMINATION SYSTEM, EATHING, CABLING, POWER DISTRIBUTION, LPS, SURVEY & SOIL TESTING. |
CLIENT | M/S PAUL WURTH |
PROJECT NAME | BHILAI STEEL PLANT BF-8 |
WORK AREAS | INBA 1 & 2- STEEL STRUCTURE COMPRISING OF GRANULATION TANK & DEWATERING SYSTEM, RUNG LADDER, SPLICES, CONNECTION JOINTS, BASE PLATES AND MOUNTING BRACKETS, STRESS ANALYSIS. |
CLIENT | M/S JINDAL STEEL & POWER LIMITED |
PROJECT NAME | DOUBLE GIRDER & SINGLE GIRDER EOT CRANE |
WORK AREAS | 5T X 6M-DSL TRAVEL 34.5M CRANE GRAB TYPE DOUBLE GIRDER EOT CRANE, 7.5T X 15.6M-DSL TRAVEL 76M, 7.5T X 8.6M-DSL TRAVEL 76M & 5T X 9.8M-DSL TRAVEL 51.5M CRANE UNDER SLUNG TYPE SINGLE GIRDER EOT CRANE WITH OPERATING MANUAL. |
CLIENT | M/S B.K.PODDER |
PROJECT NAME | PULP AND PRINTING FACTORY |
WORK AREAS | TOTAL PROJECT MANAGEMENT FOR 9 ACRE LAND AREA INCLUDING LANDSCAPING. 4 PROCESISNG ZONES OF PAPER PRODUCTION, AUXILIARY BUILDINGS, WATER TANKS, RAIN WATER HARVESTING, STAFF QUARETER, CANTEEN, PIPING, ELECTRICALS, ROADS & DRAINAGE. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | DUCTILE IRON PIPE PLANT |
WORK AREAS | 7 CRUCIBLE X 10T CAPACITY INDUCTION FURNACE, MELTING UNITS, CASTING UNITS, SUB-STATION, WATER SUPPLY SYSTEM, PIPING SYSTEM, PUMPS, AIR COMPRESSORS WITH AFTER COOLERS, MOISTURE SEPARATORS, RECEIVERS, AIR DRYERS, FUME EXTRACTION SYSTEM, AIR POLLUTION CONTROL SYSTEM, HT-LT PANELS, POWER DISTRIBUTION, CABLING-EARTHING SYSTEM, LIGHTING SYSTEM. |
CLIENT | M/S BHILAI ENGINEERING CORPORATION |
PROJECT NAME | CDCP AREA FOR IISCO BURNPUR & ROURKELA STEEL PLANT |
WORK AREAS | DUST CYCLONE OF SIZE 2820 MM & 2000 MM DIA DUST CYCLONE AND COLLECTION SYSTEM WITH DUST-FREE COKE CHARGING DEVICE AND BLASTING DEVICE WITH CIRCULATING WATER PUMP HOUSE. HOISTING DEVICES & SERVICE WATER COOLING TOWERS. |
CLIENT | M/S SIDDAGANGA ALLOYS ISPAT PVT LTD |
PROJECT NAME | 250 TPD ROLLING MILL PLANT |
WORK AREAS | TOTAL PROJECT MANAGEMENT TILL COMMISSIONING CONSISTING OF MAIN PLANT AND AUXILIARY BUILDINGS, PIPING OF COOLING WATER, PUMPS, WATER TANK, COMPRESSED AIR-FUEL OIL, POLLUTION CONTROL, ELCTRICAL SYSTEM COMPRISING OF TRANSFORMER,SUBSTATION,HT/LT PANEL, POWER DISTRIBUTION, EARTHING SYSTEM, LIGHTNING PROTECTION SYSTEM, CABLING. |
CLIENT | M/S RASHMI GROUP |
PROJECT NAME | SMS-II |
WORK AREAS | 2*20MT CAPACITY INDUCTION MELTING FURNACE, LADLE REFINING SURFACE, CONTINUOUS CASTING MACHINES, ENHANCEMENT OF 132 KV SUB-STATION BY ADDING ONE 30/35 MVA, WATER TREATMENT PLANT, RESERVOIRS, PUMPS, COOLING TOWERS, AIR POLLUTION CONTROL SYSTEM, AIR COMPRESSORS, HT-LT PANEL, POWER DISTRIBUTION, CABLING SYSTEM, EARTHING SYSTEM, LIGHTING SYSTEM. |
CLIENT | M/S SMS DEMAG |
PROJECT NAME | SALEM STEEL PLANT |
WORK AREAS | AIR CONDITIONING SYSTEM & CHILLING WATER SYSTEM FOR CASTER BUILDING AREA COMPRISING OF MAIN CONTROL ROOM, PLC/DRIVE ROOM, TCM PULPIT, SHIFT OFFICE. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | INDUCTION FURNACE 2*8T AND 2*15T & ROLLING MILL OF 20 TPH |
WORK AREAS | MAIN PRODUCTION BUILDINGS OF SMS & ROLLING MILL, MATERIAL HANDLING SYSTEM, INDUCTION FURNACES, DRIVES, LADLES, ROLLER TABLES, COOLING BED, SHEARS, PINCH ROLLS, MACHINE FOUNDATIONS, WATER COOLING SYSTEM, FIRE FIGHTING SYSTEM, ROADS AND DRAINAGE, PIPING SYSTEM FOR AIR-WATER-FUEL OIL, UTILITY SYSTEM, HT SYSTEM, POWER DISTRIBUTION, CONTROL SCHEME OF EQUIPMENTS, CONTROL GEARS, LIGHTING SYSTEM, CABLE SELECTION & ROUTING, PANELS. POLLUTION RELATED STUDY DONE FOR 3LAC MT ROLLING MILL ON BASIS OF WHICH POLLUTION CONTROL SYSTEM WAS DESIGNED. |
CLIENT | M/S BHILAI ENGINEERING CORPORATION |
PROJECT NAME | COKE OVEN PLANT FOR IISCO MODERNIZATION |
WORK AREAS | PI DIAGRAM, ACVS, DUCTING, HVAC SYSTEM FOR PLANT MODERNIZATION. |
CLIENT | M/S SHAKTI DEVELOPMENT PVT LTD |
PROJECT NAME | BAR ROLLING MILL OF CAPACITY 150,000 MT |
WORK AREAS | MAIN PLANT AND AUXILIARY BUILDINGS LIKE ELECTRICAL CONTROL ROOMS, SHOPS, LABORATORY, WATER COMPLEX, STORE SHEDS, ROADS & DRAINAGE. DESIGN AND SELECTION OF RE-HEATING FURNACE, BILLET TRANSFER, REJECTION SYSTEM, ROUGHING-INTERMEDIATE-FINISHING GROUP, COOLING BED, MOTORS, ROLLER TABLES, TMT STATION, EOT CRANES, MATERIAL HANDLING SYSTEM, PIPING FOR WATER-COMPRESSED AIR-FUEL OIL-GAS, SUB-STATION, TRANSFORMERS, BREAKERS, ISOLATORS, FEEDERS, LT PANEL, DISTIBUTION SYSTEM, EARTHING SYSTEM, PLANT LIGHTING SYSTEM, CABLING SYSTEM, LIGHTNING PROTECTION SYSTEM, RAIN WATER HARVESTING SCHEME. |
CLIENT | M/S MEGATHERM ELECTRONICS |
PROJECT NAME | MINI STEEL PROJECT OF WESTCOM WIRELESS, NIGERIA |
WORK AREAS | INDUCTION MELTING FURNACES, LADLE REFINING EQUIPMENT, CASTING MACHINES. |
CLIENT | M/S GSD CASTINGS PVT LTD |
PROJECT NAME | STEEL MELTING & BILLET CASTING |
WORK AREAS | FEASIBILITY REPORT. |
CLIENT | M/S ALSTOM DURGAPUR |
PROJECT NAME | EXPANSION PROJECT FOR BOILER PLANT |
WORK AREAS | EXPANSION OF SHED WITH CRANE GIRDER ON WEST SIDE WITH AUXILIARY BUILDINGS. |
CLIENT | M/S DANIELI INDIA LIMITED |
PROJECT NAME | CROP SHEAR REFURBISHMENT AT BOKARO STEEL PLANT |
WORK AREAS | RE-ENGINEERING OF STRUCTURES AS PER MECHANICAL G.A, CABLE SYSTEM, SENSOR MOUNTING ARRANGEMENT, WATER-COMPRESSED AIR PIPING, COMPRESSOR WITH DRYER & RECEIVER, CHILLER. |
CLIENT | M/S ARORA STEEL |
PROJECT NAME | NEW STEEL MELTING SHOP WITH 35T EAF |
WORK AREAS | TOTAL ENGINEERING FOR SMS WHICH INCLUDES 35T EAF, 35T LADDLE REFINING FURNACE, 35T VD, FERRO-ALLOY ADDITION SYSTEM, CONTINUOUS CASTING MACHINE, 66KV SUB-STATION, HANDLING SYSTEM FOR DRI-LIME-FERRO ALLOYS. |
CLIENT | M/S PAUL WURTH |
PROJECT NAME | TATA-JAMSHEDPUR |
WORK AREAS | INBA-1 & INBA-2 CHIMNEY STACK AND SUPPORTING STRUCTURES AND FOUNDATION DESIGN AND DETAIL ENGINEERING. |
CLIENT | M/S UTKARSH TUBES AND PIPES LTD |
PROJECT NAME | PVC PIPE PLANT, GURAP |
WORK AREAS | ARCHITECTURAL AND 3D, CIVIL AND STRUCTURALS, RAW MATERIAL LOADING AND UNLOADING CUSTOMIZED SOLUTION, FINISHED GOODS LOADING CUSTOMIZED SOLUTION, ROAD, DRAINAGE, RAIN WATER HARVESTING, FIRE FIGHTING RESERVOIR WITH PUMP HOUSE, TOTAL PIPING ENGINEERING INCLUDING PFD-P&ID-ROUTING, HVAC, HT & LT CABLING, ILLUMINATION, EARTHING, LIGHTNING PROTECTION, TELECOMMUNICATION, CCTV. |
CLIENT | M/S UNIMAC MACHINERIES FZE, DUBAI |
PROJECT NAME | STEEL PLANT, PARAGUAY |
WORK AREAS | FEASIBILITY STUDY, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, LRF, CCM, BILLET FEEDING, BAR ROLLING MILL, MEDIUM SECTION MILL, SUB-STATIONS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, OXYGEN PLANT, AOD SYSTEM, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, AFFLUENT TREATMENT SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S BSRM |
PROJECT NAME | INTAKE WELL-BANGLADESH |
WORK AREAS | FEASIBILITY STUDY AND LAYOUT PREPARATION FOR STATUATORY ACTIVITIES AND PERMISSION FROM WATER BODY MANAGEMENT, BANGLADESH. |
CLIENT | M/S TATA PROJECTS LTD |
PROJECT NAME | 1.2 MTPA PELLET PLANT, NMDC-DONIMALAI |
WORK AREAS | DELAY ANALYSIS AND COST ANALYSIS FOR CIVIL, STRUCTURAL, MECHANICAL AND ELECTRICAL PACKAGES. |
CLIENT | M/S TOP STEEL KENYA LTD |
PROJECT NAME | STEEL PLANT, KENYA |
WORK AREAS | BILLET FEEDING, 150,000 TON/ANNUMREBAR ROLLING MILL, 50,000 TON/ANNUM SECTION MILL, 33KV SWITCHYARD, POWER DISTRIBUTION, HT-LT ELECTRICALS, UTILITIES, CIVIL & STRUCTURALS, PUMPS. COOLING TOWERS, PIPING, SEWERAGE TREATMENT, 132KV SUB-STATION, EARTHING, LIGHTENING PROTECTION, ILLUMINATION, TRANSMISSION TOWERS ETC. |
CLIENT | M/S PRITHVI FERRO ALLOYS |
PROJECT NAME | STEEL PLANT, IVORY COAST |
WORK AREAS | FEASIBILITY STUDY, BANKING REPORT, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, AOD, CCM, BILLET FEEDING, BAR ROLLING MILL, RE-HEATING FURNACE, STRUCTURAL MILL, SUB-STATIONS, FACTORY SHEDS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S STARK STEEL |
PROJECT NAME | STEEL PLANT, GHANA |
WORK AREAS | FEASIBILITY STUDY, BANKING REPORT, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, AOD, ELECTRIC ARC FURNACE, SMS, CCM, BILLET FEEDING, BAR ROLLING MILL, RE-HEATING FURNACE, STEEL GRINDING MEDIA BALL MILL, OXYGEN PLANT, SUB-STATIONS, FACTORY SHEDS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S WESMAN ENGINEERING |
PROJECT NAME | DURGAPUR STEEL PLANT |
WORK AREAS | ROLLER TABLE ENGINEERING COMPRISING OF ROLLER DRAWING, CHAIN & SPROCKET, ROLLER TABLE FRAME, COMMON DRIVE FRAME, FOUNDATION LOAD DATA WITH FOUNDATION BOLT DETAILS. |
CLIENT | M/S ALSTOM PROJECTS INDIA |
PROJECT NAME | MAE MOH, PHILLIPINES |
WORK AREAS | FINITE ELEMENT ENGINEERING OF ESP INLET AND OUTLET DUCT INCLUDING STIFFNER SPACING CALCULATION & SIZING, INTERNAL BRACINGS, STUB COLUMNS, FLANGES, BASE PLATE AND SLIDE BEARING ASSEMBLY, INLET AND OUTLET DUCT SUPPORT STRUCTURE ENGINEERING WITH 3D MODEL PREPARATION, DETAILING AND CONNECTION JOINTS. |
CLIENT | M/S UNISEVEN ENGINEERING |
PROJECT NAME | ZINC FERRITE RESIDUE FUMING PROJECT, HINDUSTAN ZINC LIMITED |
WORK AREAS | BELT CONVEYORS WITH FEEDING CONVEYORS, TECHNOLOGICAL STRUCTURES, SCRAPPER CONVEYING SYSTEM, WEIGH FEEDERS, ZINC FERRITE PRESS HOPPERS, TANKS, LIMESTONE BIN, ZINC FERRITE BIN, LUMP COAL BIN, SILICA BIN, PNEUMATIC CONVEYING SYSTEM, DOUBLE DECK SCREEN, FILTER PRESS AREA PIPELINE, CIRCULAR CONVEYOR GALLERY, PIPE TRESTLE FOR SLURRY LINES, DUST SUPPRESSION SYSTEM AT TRUCK UNLOADING AREAS, SPRINKLER SYSTEM FOR LUMP COAL STOCK PILE AREA, ELECTRICAL & INSTRUMENTATION. |
CLIENT | M/S HABESHA STEEL MILLS |
PROJECT NAME | 132/33 KV SUB-STATION, ETHIOPIA |
WORK AREAS | SLD, LAYOUT, EKD, 33KV TRANSMISSION LINE, ROAD AND TRENCH, GROUNDING SYSTEM, LIGHTENING PROTECTION SYSTEM, CABLE ENGINEERING, SLAG CRUSHER, BILLET SHEAR, REVAMPING OF REHEATING FURNACE, SUB-STATION CIVIL AND STRUCTURAL ENGINEERING. |
CLIENT | M/S HABESHA STEEL MILLS |
PROJECT NAME | STEEL PLANT REVAMPING, ETHIOPIA |
WORK AREAS | PASS DESIGN MODIFICATION FOR REVAMPING OF 200 TPD EXISTING ROLLING MILL TO INCREASE PRODUCTION IN 2 PHASES OF 8600 T PER MONTH AND 9300 T PER MONTH, RELATED MECHANICAL-ELECTRICAL SYSTEM MODIFICATION, CIVIL AND STRUCTURAL ENGINEERING, FINISHED PRODUCT SHED MODIFICATION, ROLL SPECIFICATIONS. |
CLIENT | M/S STARK STEEL |
PROJECT NAME | STEEL PLANT, GHANA |
WORK AREAS | FORGING SHOP, SKEW BALL MILL, MACHINE FOUNDATIONS FOR FORGING PRESS-FORGING HAMMER-BILLET SHEAR-ROLLER TABLE-QUENCHING TANK, CABLE & PIPE TRENCH, 33KV SUB-STATION, PUMP HOUSE, WATER TANK, WEIGH BRIDGE, GOOMTY, STAFF QUARTER, BOUNDARY WALL, GATE, ROAD & DRAINAGE, COMPRESSED AIR SYSTEM, WATER SYSTEM, TECH SPEC FOR SOFTENING PLANT, ELECTRICAL LAYOUT AND DISTRIBUTION SYSTEM, 33KVA TRANSMISSION LINE ENGINEERING, EARTHING SYSTEM, LIGHTENING PROTECTION SYSTEM, ILLUMINATION SYSTEM, CABLE ENGINEERING. |