CLIENT | M/S SINO INDIA METALLURGICAL ENGINEERING SUPPLY |
PROJECT NAME | 40. 5 M2 LINEAR SINTER PLANT |
WORK AREAS | CONTROL WIRING, INSTRUMENTATION WIRING, CABLING CONSISTING OF MCC (LOCAL PUSH BUTTON STATIONS), MCC-PLC, PLC FOR HEAD ESP-TAIL ESP- MAIN EXHAUST FAN-BAG FILTER (FUEL & FLUX CRUSHER), EARTHING SYSTEM, LPS, CABLE ROUTING. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | DUCTILE IRON PIPE PLANT & ROLLING MILL |
WORK AREAS | BF GAS/LDO AND STEAM DISTRIBUTION SYSTEM WITH PFG & CONTROL SCHEME. |
CLIENT | Power Max India Pvt. Ltd. |
PROJECT NAME | Erection testing and commissioning of new COG flare stack PLC with Existing PLC system. |
WORK AREAS | (a) FO cable Laying, Splicing and Termination at COG Gas Holder, COG flare stack and booster control room. (b)Control wiring and erection of RIO Panel at boost control room. (c)Establishment of communication between booster control room and COG flare stack via FO cable. (d)Establishment of communication between COG flare stack PLC and COG gas holder HMI by using communication protocol of modbus TCP/IP. (e) Development of logic and HMI for successful communication of the COG gas holder and COG flare stack PLC. (f) All required datas of COG flare stack PLC are displayed successfully COG gas holder HMI. |