CLIENT | M/S SMS SIEMAG |
PROJECT NAME | BHUSHAN STEEL PROJECT |
WORK AREAS | 2 X 180 LD CONVERTERS (EXPANSION PHASE -II)-COOLING WATER PIPING, HOOD AREA PIPING, QUENCHER PIPING, TANK AND PUMP PIPING, ID FAN DISCHARGE PIPING, NITROGEN PIPING, COG & COMPRESSED AIR PIPING, PIPE SUPPORTS ENGINEERING, SECONDARY DE-DUSTING, TRENCH, BOOSTER FAN, PUMP HOUSE. |
CLIENT | M/S TATA PROJECT LTD |
PROJECT NAME | 1.2 MTPA PELLETIZING PLANT FOR NMDC |
WORK AREAS | PRE-BID SUPPORT, GROUND HOPPER, HPGR BUILDING, JUNCTION HOUSES, WASTE GAS CHIMNEY, PROPORTIONING BUILDING, MIXTURE HOUSE, BALLING/PELLETISING UNIT, INDURATION BUILDING, CIRCULAR COOLER, SCREENING HOUSE, FINE BINS, PELLET STORAGE AREA, MATERIAL HANDLING SYSTEM, PCI SYSTEM, FLUX PREPARATION & FEEDING SYSTEM, STACKS, PIPE & CABLE GALLERY, WATER RESERVOIRS AT DIFFERENT LEVELS, AIR COMPRESSOR STATIONS, CABLE TUNNELS, WATER PUMP HOUSE, POWER ROOMS, ESP & BAG FILTERS, AUXILIARY BUILDINGS, DUCTING. |
CLIENT | M/S SMS SIEMAG |
PROJECT NAME | JINDAL STEEL & POWER LIMITED |
WORK AREAS | INTERCONNECTING NITROGEN PIPELINE & SUPPORT STRUCTURES. |
CLIENT | M/S TOPCEM INDIA |
PROJECT NAME | 33KV SWITCH YARD AT 2000 TPD GRINDING UNIT |
WORK AREAS | TOTAL PROJECT MANAGEMENT INVOLVING CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL WITH FOUNDATION, SUPER STRUCTURE, EARTHING, PIPING, DISTRIBUTION, ILLUMINATION, CABLING. |
CLIENT | M/S SINO STEEL EQUIPMENT & ENGINEERING |
PROJECT NAME | 1.2 MTPA PELLETIZING PLANT FOR NMDC INSTRUMENTATION |
WORK AREAS | PROPORTIONING BUILDING, ROTARY KILN, ANNULAR COOLER, TRAVELLING GRATE, BALLING SHOP, MIXER ROOM, PCI, ADDETIVE-BINDER BUILDING, MULTICYCLONE FOUNDATION, SCREEN HOUSE, MILL SHOPS. |
CLIENT | M/S ALL MINERALS |
PROJECT NAME | 200 TPH IRON BENEFICIATION PLANT |
WORK AREAS | JIG BUILDING, SCRUBBER BUILDING, TAILING THICKENER, FILTER PRESS, ROD MILL, SLIME POND, COMPRESSED AIR LINE, PIPING, IRON-ORE SLURRY LINE, PUMP GLAND SEALING WATER LINE, FLUSHING & CLEANING WATER LINE, VALVES AND PIPE SUPPORTS, CONVEYOR & TRANSFER HOUSE. |
CLIENT | M/S TOP STEEL NIGERIA LTD |
PROJECT NAME | STEEL MELTING PLANT |
WORK AREAS | TOWER STRUCTURES-11 NOS, 3.8 KM-132KV TRANSMISSION LINE ROUTING, SUB-STATION, TRANSFORMER, POWER DISTRIBUTION, HT CABLING, EARTHING SYSTEM, LT CABLING SYSTEM, PANELS, FEEDERS. |
CLIENT | M/S TOP METAL |
PROJECT NAME | TOWERS STRUCTURES |
WORK AREAS | 132KV TRANSMISSION LINE TOWERS ALONG WITH ROUTING & DPR FOR STEEL PLANT COMPRISING OF PELLETISING PLANT-SINTERING PLANT-50MW CAPTIVE POWER PLANT, DI PLANT, SMS & BAR ROLLING MILL OF CAPACITY 0.3MTY. |
CLIENT | M/S NEO METALIKS |
PROJECT NAME | ANNULAR SINTER PROJECT |
WORK AREAS | TOTAL PROJECT MANAGEMENT INVOLVING CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, UTILITIES INCLUDING POLLUTION CONTROL SYSTEM AND ACVS. |
CLIENT | M/S UTKARSH TUBES AND PIPES LTD |
PROJECT NAME | PVC PLANT TUBE MILL & ROLLING MILL |
WORK AREAS | PVC PIPING, PIPE FITTINGS, MS PIPING, ROLLING MILL FOR ANGLE ROLLING WITH INTERPLANT ROAD & DRAINAGE. |
CLIENT | M/S ALL MINERALS ASIA |
PROJECT NAME | 180 TPH COAL DESHALING PLANT |
WORK AREAS | BELT CONVEYORS & TRANSFER TOWERS WITH GANTRY GIRDER, ROOF GIRDER, TRUSS, BRACINGS, TRESTLE. |
CLIENT | M/S DANIELI INDIA LIMITED |
PROJECT NAME | REVAMPING OF TARATALA FACTORY & OFFICE, AUTOMATION DIVISION |
WORK AREAS | SHED EXPANSION, WATCH TOWERS, GUARD QUARTER, ELECTRICAL CONTROL ROOM, OFFICE BUILDING, ROADS & DRAINAGE, WATER-AIR PIPING SYSTEM, EOT CRANE GIRDER SPECIFICATIONS, ILLUMINATION SYSTEM, EATHING, CABLING, POWER DISTRIBUTION, LPS, SURVEY & SOIL TESTING. |
CLIENT | M/S PAUL WURTH |
PROJECT NAME | BHILAI STEEL PLANT BF-8 |
WORK AREAS | INBA 1 & 2- STEEL STRUCTURE COMPRISING OF GRANULATION TANK & DEWATERING SYSTEM, RUNG LADDER, SPLICES, CONNECTION JOINTS, BASE PLATES AND MOUNTING BRACKETS, STRESS ANALYSIS. |
CLIENT | M/S PAUL WURTH |
PROJECT NAME | MODERN GAS CLEANING PLANT AT BF-3 FOR DURGAPUR STEEL PLANT |
WORK AREAS | BOOSTER PUMP ROOM, CONTROL ROOM, ELECTRICAL ROOM, HYDRAULIC CUM RECIRCULATION PUMP ROOM, COMBINED BUILDINGS, TRESTLES, TECHNOLOGICAL STRUCTURES. |
CLIENT | M/S B.K.PODDER |
PROJECT NAME | PULP AND PRINTING FACTORY |
WORK AREAS | TOTAL PROJECT MANAGEMENT FOR 9 ACRE LAND AREA INCLUDING LANDSCAPING. 4 PROCESISNG ZONES OF PAPER PRODUCTION, AUXILIARY BUILDINGS, WATER TANKS, RAIN WATER HARVESTING, STAFF QUARETER, CANTEEN, PIPING, ELECTRICALS, ROADS & DRAINAGE. |
CLIENT | M/S BENGAL TOOLS LTD |
PROJECT NAME | COKE SORTING PLANT FOR DURGAPUR STEEL PLANT |
WORK AREAS | COKE SORTING PLANT DESIGN AND ENGG FOR REBUILDING OF COKE OVEN BATTER NO-2 OF SAIL-DSP, MATERIAL HANDLING SYSTEM, WHARF & BELT & SHUTTLE CONVEYORS, HOISTS, WELDING MACHINES, JUNCTION HOUSES, SCREEN HOUSES, TRESTLE FOUNDATIONS, TAKE-UP STRUCTURES, TUNNEL CONVEYOR, COAL TOWERS, BUNKERS, PLATFORMS, WALKWAYS, CABLING SYSTEM, EARTHING SYSTEM, SUMP PUMPS, BELT WEIGHING SCALES, TRANSFORMERS, PANELS, CABLING, ROADS & DRAINAGE & PARKING. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | DUCTILE IRON PIPE PLANT & ROLLING MILL |
WORK AREAS | BF GAS/LDO AND STEAM DISTRIBUTION SYSTEM WITH PFG & CONTROL SCHEME. |
CLIENT | M/S SCHENCK PROCESS INDIA LTD |
PROJECT NAME | COAL WASHERY PLANT AT TURKEY |
WORK AREAS | HOPPER, THICKENER, JUNCTION HOUSE, MCCP MAIN BUILDING, MCC, BOULDER SOLED EARTHEN EFFLUENT POND. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | DUCTILE IRON PIPE PLANT |
WORK AREAS | 7 CRUCIBLE X 10T CAPACITY INDUCTION FURNACE, MELTING UNITS, CASTING UNITS, SUB-STATION, WATER SUPPLY SYSTEM, PIPING SYSTEM, PUMPS, AIR COMPRESSORS WITH AFTER COOLERS, MOISTURE SEPARATORS, RECEIVERS, AIR DRYERS, FUME EXTRACTION SYSTEM, AIR POLLUTION CONTROL SYSTEM, HT-LT PANELS, POWER DISTRIBUTION, CABLING-EARTHING SYSTEM, LIGHTING SYSTEM. |
CLIENT | M/S BHILAI ENGINEERING CORPORATION |
PROJECT NAME | CDCP AREA FOR IISCO BURNPUR & ROURKELA STEEL PLANT |
WORK AREAS | DUST CYCLONE OF SIZE 2820 MM & 2000 MM DIA DUST CYCLONE AND COLLECTION SYSTEM WITH DUST-FREE COKE CHARGING DEVICE AND BLASTING DEVICE WITH CIRCULATING WATER PUMP HOUSE. HOISTING DEVICES & SERVICE WATER COOLING TOWERS. |
CLIENT | M/S SMS SIEMAG |
PROJECT NAME | VISHAKHAPATNAM STEEL PLANT & IISCO BURNPUR |
WORK AREAS | FIRE FIGHTING SYSTEM, HVAC FOR STAINLESS STEEL MAKING AND CASTING PLANT AND COG & STEAM PIPE STRESS ANALYSIS WITH GAS PURGING SYSTEM. UTILITY PIPING & LD CONVERTER. |
CLIENT | M/S SIDDAGANGA ALLOYS ISPAT PVT LTD |
PROJECT NAME | 250 TPD ROLLING MILL PLANT |
WORK AREAS | TOTAL PROJECT MANAGEMENT TILL COMMISSIONING CONSISTING OF MAIN PLANT AND AUXILIARY BUILDINGS, PIPING OF COOLING WATER, PUMPS, WATER TANK, COMPRESSED AIR-FUEL OIL, POLLUTION CONTROL, ELCTRICAL SYSTEM COMPRISING OF TRANSFORMER,SUBSTATION,HT/LT PANEL, POWER DISTRIBUTION, EARTHING SYSTEM, LIGHTNING PROTECTION SYSTEM, CABLING. |
CLIENT | M/S RASHMI GROUP |
PROJECT NAME | SMS-II |
WORK AREAS | 2*20MT CAPACITY INDUCTION MELTING FURNACE, LADLE REFINING SURFACE, CONTINUOUS CASTING MACHINES, ENHANCEMENT OF 132 KV SUB-STATION BY ADDING ONE 30/35 MVA, WATER TREATMENT PLANT, RESERVOIRS, PUMPS, COOLING TOWERS, AIR POLLUTION CONTROL SYSTEM, AIR COMPRESSORS, HT-LT PANEL, POWER DISTRIBUTION, CABLING SYSTEM, EARTHING SYSTEM, LIGHTING SYSTEM. |
CLIENT | M/S BHILAI ENGINEERING CORPORATION |
PROJECT NAME | COKE OVEN, IISCO, BURNPUR |
WORK AREAS | PLANT BUILDING, VENTILATION & AIR CONDITIONING SYSTEM, PI DIAGRAM, ACVS, DUCTING. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | INDUCTION FURNACE 2*8T AND 2*15T & ROLLING MILL OF 20 TPH |
WORK AREAS | MAIN PRODUCTION BUILDINGS OF SMS & ROLLING MILL, MATERIAL HANDLING SYSTEM, INDUCTION FURNACES, DRIVES, LADLES, ROLLER TABLES, COOLING BED, SHEARS, PINCH ROLLS, MACHINE FOUNDATIONS, WATER COOLING SYSTEM, FIRE FIGHTING SYSTEM, ROADS AND DRAINAGE, PIPING SYSTEM FOR AIR-WATER-FUEL OIL, UTILITY SYSTEM, HT SYSTEM, POWER DISTRIBUTION, CONTROL SCHEME OF EQUIPMENTS, CONTROL GEARS, LIGHTING SYSTEM, CABLE SELECTION & ROUTING, PANELS. POLLUTION RELATED STUDY DONE FOR 3LAC MT ROLLING MILL ON BASIS OF WHICH POLLUTION CONTROL SYSTEM WAS DESIGNED. |
CLIENT | M/S SHAKTI DEVELOPMENT PVT LTD |
PROJECT NAME | BAR ROLLING MILL OF CAPACITY 150,000 MT |
WORK AREAS | MAIN PLANT AND AUXILIARY BUILDINGS LIKE ELECTRICAL CONTROL ROOMS, SHOPS, LABORATORY, WATER COMPLEX, STORE SHEDS, ROADS & DRAINAGE. DESIGN AND SELECTION OF RE-HEATING FURNACE, BILLET TRANSFER, REJECTION SYSTEM, ROUGHING-INTERMEDIATE-FINISHING GROUP, COOLING BED, MOTORS, ROLLER TABLES, TMT STATION, EOT CRANES, MATERIAL HANDLING SYSTEM, PIPING FOR WATER-COMPRESSED AIR-FUEL OIL-GAS, SUB-STATION, TRANSFORMERS, BREAKERS, ISOLATORS, FEEDERS, LT PANEL, DISTIBUTION SYSTEM, EARTHING SYSTEM, PLANT LIGHTING SYSTEM, CABLING SYSTEM, LIGHTNING PROTECTION SYSTEM, RAIN WATER HARVESTING SCHEME. |
CLIENT | M/S MEGATHERM ELECTRONICS |
PROJECT NAME | STEEL MELTING SHOP & INDUCTION MELTING FURNACES |
WORK AREAS | PUMPS, COOLING TOWER, DM & SOFTENING PLANT, AIR COMPRESSOR, ALL PIPE LINES, POWER SYSTEM, DISTIRBUTION & LT PANELS, EARTHING SYSTEM, CABLING SYSTEM, LIGHTING SYSTEM, TRANSFORMERS, FUME EXTRACTION SYSTEM. |
CLIENT | M/S GSD CASTINGS PVT LTD |
PROJECT NAME | STEEL MELTING & BILLET CASTING |
WORK AREAS | FEASIBILITY REPORT. |
CLIENT | M/S ALSTOM DURGAPUR |
PROJECT NAME | EXPANSION PROJECT FOR BOILER PLANT |
WORK AREAS | EXPANSION OF SHED WITH CRANE GIRDER ON WEST SIDE WITH AUXILIARY BUILDINGS. |
CLIENT | M/S DANIELI INDIA LIMITED |
PROJECT NAME | CROP SHEAR REFURBISHMENT AT BOKARO STEEL PLANT |
WORK AREAS | RE-ENGINEERING OF STRUCTURES AS PER MECHANICAL G.A, CABLE SYSTEM, SENSOR MOUNTING ARRANGEMENT, WATER-COMPRESSED AIR PIPING, COMPRESSOR WITH DRYER & RECEIVER, CHILLER. |
CLIENT | M/S DISHERGARH POWER SUPPLY CORP LTD |
PROJECT NAME | 220 KV TRANSMISSION TOWERS |
WORK AREAS | DOUBLE CIRCUIT TRANSMISSION TOWERS WITH EARTH PIT. |
CLIENT | M/S MALDA METAL PVT LTD |
PROJECT NAME | ROLLING MILL PLANT |
WORK AREAS | MAIN PLANT AND AUXILIARY BUILDINGS INCLUDING TRANSFORMER-FURNACE FOUNDATION, PLATFORMS, MAIN MILL MOTOR FOUNDATION, RE-HEATING FURNACE, BILLET TRANSFER, REJECTION SYSTEM FOR UNQUALIFIED BILLET, ROUGHING-INTERMEDICATE-FINISHING GROUPS, COOLING BED, TMT STATION, EOT CRANES, PUMPS, COOLING TOWER, WATER TREATMENT SYSTEM, AIR COMPRESSOR, HT/LT PANELS, TRANSFORMERS, BREAKERS, ISOLATORS, EARTHING SYSTEM, PLANT LIGHTING SYSTEM. |
CLIENT | M/S RASHMI METALIKS |
PROJECT NAME | DUCTILE IRON-PIPE PLANT |
WORK AREAS | SAND DRYING SHOP, PUMP HOUSE, CORE SHOP, CHIMNEY FOR ROLLING MILL. |
CLIENT | M/S B.S.SPONGE PVT LTD |
PROJECT NAME | INDUCTION FURNACE-8T |
WORK AREAS | PRODUCTION PLANT, EQUIPMENTS, MATERIAL HANDLING SYSTEM, PLANT WATER SUPPLY & DISTRIBUTION SYSTEM, PIPING, UTILITY SYSTEM, SUBSTATION, H.T/LT WITH FEEDERS, PANELS, CABLING, EARTHING, ILLUMINATION SYSTEM, POWER DISTRIBUTION WITH PROVISION OF FUTURE EXPANSION OF 12MT X 2FURNACE WITH 4/7 CONCAST. |
CLIENT | M/S ALSTOM T & D INDIA LTD |
PROJECT NAME | BANDEL SUB-STATION |
WORK AREAS | EER&M JOB OF 56 YEAR OLD SUB-STATION INCLUDING AHP BUILDING-COOLING TOWER-VACUUM PUMP AREA, CABLING, LIGHTING, 132 KV ISOLATORS, EARTHING, GROUNDING SYSTEM, 25 MVA & 16 MVA TRANSFORMER, 220 VOLT DC SYSTEM, BUS-BAR SYSTEM, LT TRAFO, 415 VOLT PMCC, MLDB, FIRE FIGHTING SYSTEM. |
CLIENT | M/S STUP CONSULTANTS |
PROJECT NAME | KOLKATA-EAST WEST METRO |
WORK AREAS | UNDERGROUND STEEL STRUCTURES FOR "TOP-DOWN" CONSTRUCTION AND ANCILLARY CIVIL BUILDINGS AT SEALDAH PLATFORM. |
CLIENT | M/S PURULIA METAL CASTING |
PROJECT NAME | INDUCTION MELTING FURNACE |
WORK AREAS | TOTAL ENGINEERING FOR EXPANSION OF EXISTING MELTING SHOP AND HOT CHARGING FACILITY OF BILLETS WITH HIGH-SPEED CONVEYOR AND INTERMEDIATE HEAT EQUALIZATION SYSTEM ALONG WITH ENGINEERING FOR INSTALLATION OF 15MT CAPACITY INDUCTION MELTING FURNACE. |
CLIENT | M/S ARORA STEEL |
PROJECT NAME | NEW STEEL MELTING SHOP WITH 35T EAF |
WORK AREAS | TOTAL ENGINEERING FOR SMS WHICH INCLUDES 35T EAF, 35T LADDLE REFINING FURNACE, 35T VD, FERRO-ALLOY ADDITION SYSTEM, CONTINUOUS CASTING MACHINE, 66KV SUB-STATION, HANDLING SYSTEM FOR DRI-LIME-FERRO ALLOYS. |
CLIENT | M/S STERLING & WILSON |
PROJECT NAME | NEPAL ELECTRICITY |
WORK AREAS | PRE BID ENGINEERING FOR 2 NEW SUB-STATIONS AND AUGMENTATION OF 4 OLD SUB-STATIONS |
CLIENT | M/S SHAPOORJI PALLONJI |
PROJECT NAME | NMDC-NAGARNAR |
WORK AREAS | SLUDGE THICKENER & DE-WATERING AREA. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | ULTRATECH CEMENT PLANT & GIS SUB-STATION AT GUMA |
WORK AREAS | CABLE GALLERY CIVIL & STRUCTURALS FOR ULTRATECH. PUMP HOUSE, OVERHEAD TANK, EOT BUILDING, RAIN WATER HARVESTING FOR GUMA. |
CLIENT | M/S PAUL WURTH |
PROJECT NAME | TATA-JAMSHEDPUR |
WORK AREAS | INBA-1 & INBA-2 CHIMNEY STACK AND SUPPORTING STRUCTURES AND FOUNDATION DESIGN AND DETAIL ENGINEERING. |
CLIENT | M/S TECPRO SYSTEMS |
PROJECT NAME | BHILAI STEEL PLANT PACKAGE-64 & 61, SAIL MEGHATUBURU |
WORK AREAS | CONVEYOR DESIGN AND DETAIL ENGINEERING FOR 24 CONVEYORS FOR AUGMENTATION WORK OF FUEL & FLUX CRUSHING FACILITIES, COAL HANDLING PLANT & COKE SORTING PLANT. DETAIL ENGINEERING FOR ANOTHER 55 CONVEYORS. DETAIL DRAWINGS FOR APRON FEEDER, COMMUNICATION TOWER, CENTRAL CONTROL ROOM, PUMP HOUSE WITH WATER TANK, DD SCREEN, SPIRAL CLASSIFIER. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | 400/220 KV GIS SUB-STATION AT GUMMA, HIMACHAL PRADESH |
WORK AREAS | EOT CRANE BUILDING, PUMP HOUSE, RAIN WATER HARVESTING, SLOPE PROTECTION RETAINING WALLS, RCC WATER TANK, ILLUMINATION ENGINEERING, TRANSFORMER & BATTERY SIZING, CABLE ENGINEERING, EARTHING DESIGN AND NETWORK ENGINEERING. |
CLIENT | M/S UTKARSH TUBES AND PIPES LTD |
PROJECT NAME | PVC PIPE PLANT, GURAP |
WORK AREAS | ARCHITECTURAL AND 3D, CIVIL AND STRUCTURALS, RAW MATERIAL LOADING AND UNLOADING CUSTOMIZED SOLUTION, FINISHED GOODS LOADING CUSTOMIZED SOLUTION, ROAD, DRAINAGE, RAIN WATER HARVESTING, FIRE FIGHTING RESERVOIR WITH PUMP HOUSE, TOTAL PIPING ENGINEERING INCLUDING PFD-P&ID-ROUTING, HVAC, HT & LT CABLING, ILLUMINATION, EARTHING, LIGHTNING PROTECTION, TELECOMMUNICATION, CCTV. |
CLIENT | M/S STERLING & WILSON |
PROJECT NAME | BHERAMARA, BANGLADESH |
WORK AREAS | PRE BID ENGINEERING FOR CIVIL AND ELECTRICAL ENGINEERING FOR 132KV AND 230KV SUB-STATION. |
CLIENT | M/S SHAPOORJI PALLONJI |
PROJECT NAME | NMDC-NAGARNAR |
WORK AREAS | CHEMICAL STORAGE AND CHLORINE DIOXIDE PLANT. |
CLIENT | M/S UNIMAC MACHINERIES FZE, DUBAI |
PROJECT NAME | STEEL PLANT, PARAGUAY |
WORK AREAS | FEASIBILITY STUDY, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, LRF, CCM, BILLET FEEDING, BAR ROLLING MILL, MEDIUM SECTION MILL, SUB-STATIONS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, OXYGEN PLANT, AOD SYSTEM, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, AFFLUENT TREATMENT SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S SCHENCK PROCESS INDIA LTD |
PROJECT NAME | LAFARGE RAJASTHAN |
WORK AREAS | STORAGE SHED, CORRUGATED BELT CONVEYOR AT 55 DEGREES, CHAIN CONVEYOR, HOPPER, APRON FEEDER, PLATFORMS. |
CLIENT | M/S TATA PROJECTS LTD |
PROJECT NAME | 1.2 MTPA PELLET PLANT, NMDC-DONIMALAI |
WORK AREAS | DELAY ANALYSIS AND COST ANALYSIS FOR CIVIL, STRUCTURAL, MECHANICAL AND ELECTRICAL PACKAGES. |
CLIENT | M/S BSRM |
PROJECT NAME | ADMIN MILL BUILDING AT CHITTAGONG AND OFFICER'S DORMITORY COMPLEX AT MIRESARAI |
WORK AREAS | RESEARCH STUDY AND DETAILED DESIGN CONVERTING RCC BUILDING INTO STEEL. |
CLIENT | M/S TOP STEEL KENYA LTD |
PROJECT NAME | STEEL PLANT, KENYA |
WORK AREAS | BILLET FEEDING, 150,000 TON/ANNUMREBAR ROLLING MILL, 50,000 TON/ANNUM SECTION MILL, 33KV SWITCHYARD, POWER DISTRIBUTION, HT-LT ELECTRICALS, UTILITIES, CIVIL & STRUCTURALS, PUMPS. COOLING TOWERS, PIPING, SEWERAGE TREATMENT, 132KV SUB-STATION, EARTHING, LIGHTENING PROTECTION, ILLUMINATION, TRANSMISSION TOWERS ETC. |
CLIENT | M/S STERLING & WILSON |
PROJECT NAME | OPTCL-8 SUBSTATION |
WORK AREAS | SLD, LAYOUT, EKD, CABLE SCHEDULE & TERMINATION, TRENCH LAYOUTS, EARHTING, LIGHTENING PROTECTION, ILLUMINATION, POLE STRUCTURES, BUILDINGS, EQUIPMENT AND TOWER FOUNDATIONS, ROAD & DRAINAGE, RETAINING WALL, BOUNDARY. |
CLIENT | M/S PRITHVI FERRO ALLOYS |
PROJECT NAME | STEEL PLANT, IVORY COAST |
WORK AREAS | FEASIBILITY STUDY, BANKING REPORT, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, AOD, CCM, BILLET FEEDING, BAR ROLLING MILL, RE-HEATING FURNACE, STRUCTURAL MILL, SUB-STATIONS, FACTORY SHEDS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S STARK STEEL |
PROJECT NAME | STEEL PLANT, GHANA |
WORK AREAS | FEASIBILITY STUDY, BANKING REPORT, LAYOUT PREPARATION, TOTAL ENGINEERING FOR IF, AOD, ELECTRIC ARC FURNACE, SMS, CCM, BILLET FEEDING, BAR ROLLING MILL, RE-HEATING FURNACE, STEEL GRINDING MEDIA BALL MILL, OXYGEN PLANT, SUB-STATIONS, FACTORY SHEDS, MISC BUILDINGS, TANKS, COMPRESSOR HOUSES, TRANSMISSION TOWERS, POLLUTION CONTROL, PIPING FOR FUEL-OIL-WATER SYSTEM, FIRE DETECTION & FIGHTING, STORM WATER SYSTEM, HT-LT CABLING, SCHEDULING, EARTHING, LIGHTENING PROTECTION SYSTEM, ILLUMINATION. |
CLIENT | M/S TOP STEEL NIGERIA LTD |
PROJECT NAME | STEEL PLANT, NIGERIA |
WORK AREAS | SHED ENGINEERING, VENTILATION, FOUNDATION, ELECTRICALS WITH 33KV LINE-IN, SWITCHYARD, HT-LT SYSTEM, AUXILIARY EQUIPMENTS, ILLUMINATION, PANELS DESIGN, SLD, VETTING, INSPECTION. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | 220/132/33 KV PALATANA, BINA, NMDC SUB-STATION |
WORK AREAS | 220 KV GIS BUILDING, TRANSFORMER FOUNDATION, FIRWALL, 33KV GIS BUILDING. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | 220/132/33 KV-4 SUB-STATIONS OF BSPTCL |
WORK AREAS | LAYOUTS, ARCHITECTURE, CONTROL ROOM BUILDING, STORE CUM UNLOADING SHED, EQUIPMENT STRUCTURES & FOUNDATIONS, WATCH TOWER, SECURITY BARRACKS, TOWER FOUNDATIONS, TRANSFORMER FOUNDATIONS. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | 220 KV SUB-STATIONS OF RRVPNL, BHADLA |
WORK AREAS | CONTROL ROOM BUILDING, FIRE FIGHTING BUILDING, WATER TANK, STORE SHED BUILDING. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | 132/33 KV SUB-STATIONS OF CHANDAKA, LAPANGA OF OPTCL |
WORK AREAS | 132KV GIS BUILDING, CONTROL ROOM BUILDING, STRUCTURAL DESIGN OF TOWERS. |
CLIENT | M/S WESMAN ENGINEERING |
PROJECT NAME | DURGAPUR STEEL PLANT |
WORK AREAS | MODEL, DESIGN AND DETAILED ENGINEERING FOR CHIMNEY. |
CLIENT | M/S HALDIA NIRMAN PROJECTS |
PROJECT NAME | NEW ROTARY HEARTH FURNACE AT WHEEL & AXLE PLANT, DURGAPUR STEEL PLANT |
WORK AREAS | SHED, CHIMNEY, ROTARY HEARTH FURNACE FOUNDATION, MCC BUILDING, ROLLER TABLE FOUNDATION. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | 132/33 KV SUB-STATION OF URNI, HPPTCL |
WORK AREAS | CONTROL ROOM BUILDING. |
CLIENT | M/S ALSTOM T & D |
PROJECT NAME | 132/33 KV-SUB-STATION OF LAUKHAI, BSPTCL |
WORK AREAS | 132 KV AIS CONTROL BUILDING, TOWER & GANTRY STRUCTURES, TOWER FOUNDATION, YARD FOUNDATION. |
CLIENT | M/S ALSTOM PROJECTS INDIA |
PROJECT NAME | MAE MOH, PHILLIPINES |
WORK AREAS | FINITE ELEMENT ENGINEERING OF ESP INLET AND OUTLET DUCT INCLUDING STIFFNER SPACING CALCULATION & SIZING, INTERNAL BRACINGS, STUB COLUMNS, FLANGES, BASE PLATE AND SLIDE BEARING ASSEMBLY, INLET AND OUTLET DUCT SUPPORT STRUCTURE ENGINEERING WITH 3D MODEL PREPARATION, DETAILING AND CONNECTION JOINTS. |
CLIENT | M/S ALSTOM PROJECTS INDIA |
PROJECT NAME | NTPC VINDHYACHAL |
WORK AREAS | BALL MILL BUILDING AND DEWATERING BUILDING. |
CLIENT | M/S ALSTOM BOILER |
PROJECT NAME | DURGAPUR PLANT |
WORK AREAS | SURVEY, GA, DETAILED ENGINEERING FOR SYSTEM BENDER AREA, SHOT BLASTING MACHINE AREA, LEAN TO SHED, GABLE MODIFICATIONS, TUBE STORAGE ARRANGEMENT, SEMI GOLIATH CRANE ARRANGEMENT, INTRA BUILDING BRIDGES & WALKWAYS, FINISHED GOODS AREA APRON FOUNDATION, X-RAY CONTROL ROOM, ROAD & DRAINAGE. |
CLIENT | M/S ALSTOM PROJECTS INDIA |
PROJECT NAME | JSW, TORANGALLU |
WORK AREAS | PRE-BID ENGINEERING FOR PULVERISER FOUNDATION, MOTOR FOUNDATION, COAL & OIL BURNER, RC FEEDER, PULVERISER SUPPORT, FEEDER FLOOR EXTENSION, COAL BUNKER, MODIFICATION ENGINEERING. |
CLIENT | M/S HABESHA STEEL MILLS |
PROJECT NAME | 132/33 KV SUB-STATION, ETHIOPIA |
WORK AREAS | SLD, LAYOUT, EKD, 33KV TRANSMISSION LINE, ROAD AND TRENCH, GROUNDING SYSTEM, LIGHTENING PROTECTION SYSTEM, CABLE ENGINEERING, SLAG CRUSHER, BILLET SHEAR, REVAMPING OF REHEATING FURNACE, SUB-STATION CIVIL AND STRUCTURAL ENGINEERING. |
CLIENT | M/S HABESHA STEEL MILLS |
PROJECT NAME | STEEL PLANT REVAMPING, ETHIOPIA |
WORK AREAS | PASS DESIGN MODIFICATION FOR REVAMPING OF 200 TPD EXISTING ROLLING MILL TO INCREASE PRODUCTION IN 2 PHASES OF 8600 T PER MONTH AND 9300 T PER MONTH, RELATED MECHANICAL-ELECTRICAL SYSTEM MODIFICATION, CIVIL AND STRUCTURAL ENGINEERING, FINISHED PRODUCT SHED MODIFICATION, ROLL SPECIFICATIONS. |
CLIENT | M/S STARK STEEL |
PROJECT NAME | STEEL PLANT, GHANA |
WORK AREAS | FORGING SHOP, SKEW BALL MILL, MACHINE FOUNDATIONS FOR FORGING PRESS-FORGING HAMMER-BILLET SHEAR-ROLLER TABLE-QUENCHING TANK, CABLE & PIPE TRENCH, 33KV SUB-STATION, PUMP HOUSE, WATER TANK, WEIGH BRIDGE, GOOMTY, STAFF QUARTER, BOUNDARY WALL, GATE, ROAD & DRAINAGE, COMPRESSED AIR SYSTEM, WATER SYSTEM, TECH SPEC FOR SOFTENING PLANT, ELECTRICAL LAYOUT AND DISTRIBUTION SYSTEM, 33KVA TRANSMISSION LINE ENGINEERING, EARTHING SYSTEM, LIGHTENING PROTECTION SYSTEM, ILLUMINATION SYSTEM, CABLE ENGINEERING. |
CLIENT | M/S ASSOCIATED FURNACES |
PROJECT NAME | CYLINDER MOUNTING BRACKET |
WORK AREAS | ANALYSIS AND DESIGN FOR MOUNTING BRACKET OF CYLINDER FOR 111MT VERTICAL LOADING. |
CLIENT | M/S SPARKWEST STEEL INDUSTRIES |
PROJECT NAME | ELECTRICAL POLES, NIGERIA |
WORK AREAS | 3D MODEL, GA, ASSEMBLY, CABLE TRAY, LADDER-CNC MACHINE READABLE SHOP DRAWINGS FOR 10M AND 15M SOLAR POLES WITH CONNECTION DETAILING FOR LIGHTNING ARRESTOR, OBSTRUCTION LIGHT, ANTENNA MOUNT, SOLAR PANEL. |
CLIENT | M/S NEO METALIKS |
PROJECT NAME | HOT METAL LADLE CRANE SHED, DURGAPUR |
WORK AREAS | STRUCTURAL AND CIVIL STABILITY CHECKING OF EXISTING SHED FOR PROPOSED NEW CRANE IMPLEMENTATION. |
CLIENT | M/S SPARKWEST STEEL INDUSTRIES |
PROJECT NAME | TRANSPORT INTERCHANGE, NIGERIA |
WORK AREAS | 3D MODEL AND ARCHITECTURE FOR PRE-BID SUPPORT OF 3 INTERCHANGE VEHICLE TERMINALS IN REVIT SUITE SOFTWARE WITH INTERCONNECTING BRIDGES AND WALKWAYS. |
CLIENT | M/S DCPL |
PROJECT NAME | CEMENT PLANT, MADHYA PREADESH |
WORK AREAS | LIMESTONE CRUSHING & SCREENING SYSTEM COMPRISING OF DESIGN AND DETAIL ENGINEERING OF TRANSFER TOWERS, SURGE BUILDING, CONVEYORS, MAGNETIC SEPARATOR BUILDING, CRUSHER BUILDING, BAG FILTER SHED, SCREENING BUILDING, RETAINING WALL AT DUMPING AREA, TRACK FOUNDATION FOR STACKER, STACKER SHED. |